Ability to drag & drop to edit planned vessel usage on the batch schedule for in-progress batches

I’m pleased to confirm that we’ve implemented a solution for this. You’ve always been able to edit the planned vessel time if the batch was not yet in that vessel, but from the point the batch utilised that vessel, the line was no longer editable… it now is :tada: