Planned Packaging - schedule just the date?

Thanks for the suggestion.

I’m not sure that removing the product (and therefore quantity and volume) from a planned packaging is the right route. At this point, it’s just an event and is so far from a planned packaging. A lot of things in Breww look at planned packaging, such as stock forecasting, pre-selling and more (and would therefore all need changing if the product was no longer a part of a planned packaging).

We’ve another suggestion to simply be able to add events to batches/dates and show them on the calendar and as a tick list. I think this would be better suited to what you’re looking for here?

What do you think?

1 Like