# Ability to drag & drop to edit planned vessel usage on the batch schedule for in-progress batches

**URL:** <https://community.breww.com/t/ability-to-drag-drop-to-edit-planned-vessel-usage-on-the-batch-schedule-for-in-progress-batches/4753>\
**Category:** Ideas & feature requests\
**Tags:** idea-completed\
**Created:** [13 August 2024 11:28 UTC](https://community.breww.com/t/ability-to-drag-drop-to-edit-planned-vessel-usage-on-the-batch-schedule-for-in-progress-batches/4753 "2024-08-13T11:28:22Z")\
**Posts on this page:** 1\
**Showing post:** 7

<div class="post-metadata">

**Author:** ![luke](https://community.breww.com/user_avatar/community.breww.com/luke/32/3636_2.png) [@luke](https://community.breww.com/u/luke)\
**Post date:** [24 July 2026 10:30 UTC](https://community.breww.com/t/ability-to-drag-drop-to-edit-planned-vessel-usage-on-the-batch-schedule-for-in-progress-batches/4753/7 "2026-07-24T10:30:49Z")

</div>

I’m pleased to confirm that we’ve implemented a solution for this. You’ve always been able to edit the planned vessel time if the batch was not yet in that vessel, but from the point the batch utilised that vessel, the line was no longer editable… it now is 🎉

> [@Update how long a batch will stay in its current vessel directly from the batch schedule](https://community.breww.com/t/update-how-long-a-batch-will-stay-in-its-current-vessel-directly-from-the-batch-schedule/7265):
>
> On the batch schedule, you can now drag the end of the block for the vessel a batch is currently in to change its planned end date - no need to open the batch to edit its details. If the vessel wasn’t planned, Breww will create the plan for you from the date it was filled.

---